• Client
  • Project
  • End Date
  • Details
  • AR Family

    AR Apartment

    April 2016

  • USAF 39 CONS/ LGCA

    Repair HVAC Youth Center, Bldg#3975

    January 2016

  • USAF 39 CONS/ LGCA

    Replace Exterior Lighting

    January 2016

  • USAF 39 CONS/ LGCA

    Constructing SFS Garage

    December 2015

  • USAF 39 CONS/ LGCA

    RPR Roof SOC1 B89

    November 2015

  • USAF 39 CONS/ LGCA

    Rpr Fuel Tank High Level Cont Billeting

    October 2015

  • USAF 39 CONS/ LGCA

    RPR HVAC System, Bldg 444

    October 2015

  • USAF 39 CONS/ LGCA

    Replace Roof-top HVAC Unit B470

    September 2015

  • AFCEC/ ECC

    Rpr Vrs POL Facilities

    August 2015

  • USAF 39 CONS/ LGCA

    Repair Electrical Substations

    July 2015

  • AFCEC

    RepairTank4, Incirlik AB, Turkey

    November 2014

  • USAF 39 CONS/ LGCA

    Repair Restore Squadron Operations Facility (SOC1)

    November 2014

  • USACE

    Upgrade HVAC & Fire Alarm, Lockers, Bldg#2715, Incirlik AB, Turkey

    November 2014

  • USAF 39 CONS/ LGCA

    Maintain Crash Rated B & C Gates

    October 2014

  • USAF 39 CONS/ LGCA

    Upgrade/Modify Office Space Building 564

    October 2014

  • AFCEC

    AFCEE Repair Fuel Tanks, Pipelines and Oil Water Separators

    September 2014

  • USAF 39 CONS/ LGCA

    Repair HVAC System, Command Post B364

    August 2014

  • ITSI Gilbane Company

    Rpr Pump House 1A, Bldg 510

    July 2014

  • USAF 39 CONS/ LGCA

    Reconfigure Izmir ATA Entry Control Point

    July 2014

  • USAF 39 CONS/ LGCA

    Repair Electrical Substation, TR124 & TR69

    January 2014

  • Sandia National Lab.

    Physical Security Upgrades, Incirlik AB, Turkey

    November 2013

  • 39 CONS/ LGCA

    Install Water Meters Base Facilities

    September 2013

  • USAF 39 CONS/ LGCA

    Ctr- Repair Electric Panels at Sewage Plant

    August 2013

  • Us Consulate / Adana

    Physical Security Upgerades, Adana Consulate

    August 2013

  • USAF 39 CONS/ LGCA

    CNS Install Additional Irrigation SYS, Golf Course

    July 2013

  • USAF 39 CONS/ LGCA

    Rpr Fuel Tanks, Bldg 877 & Bldg 484

    July 2013

  • USAFE_39th Contracting Squadron

    Herky House Phase III

    May 2013

  • USAFE_39th Contracting Squadron

    Install Tactical Baffles, CATM

    March 2013

  • ECCO GmbH / ECC Europe

    Environmental Protection and Land Reclamation Works

    August 2012

  • USAFE_39th Contracting Squadron

    Repair Hush House #2115

    August 2012

  • USACE_ TUSEG Turkey

    Fuel Tank Removal DoD School

    January 2012

  • USACE_Europe Office

    Multiple Award Task Order Contract (MATOC_AZB09)

    November 2011

  • USAFE_39th Contracting Squadron

    Repair HVAC System Fitness Center Building #973

    July 2011

  • USAFE_39th Contracting Squadron

    Repair/Replace Electrical Power Generator, TACAN Building #2550

    July 2011

  • USACE_ TUSEG Turkey

    Eagle Houses Restrooms and ve Parking Lots

    May 2011

  • USACE_ TUSEG Turkey

    Repair Medical System Infrastructure

    April 2011

  • USAFE_39th Contracting Squadron

    Reverse Osmosis System, Building #33

    April 2011

  • US State Department_Adana Consulate

    Physical Security Upgrades, Adana Consulate

    October 2010

  • USAFE_39th Contracting Squadron

    Waste Water Reuse Irrigation

    June 2010

  • USAFE_39th Contracting Squadron

    Water Softening Facility and Equipments

    February 2010

  • USAFE_39th Contracting Squadron

    Repair Dog Kennels & Document Staging Building #15

    September 2009

  • T.C Garanti Bank

    Adana OSB Branch Design

    August 2009

  • USAFE_39th Contracting Squadron

    Improve Aya Playground Area

    January 2009

  • USAFE_39th Contracting Squadron

    Construct Bullet Trap

    June 2008

  • USAFE_39th Contracting Squadron

    Repair Aircraft Runway Joint Seal

    May 2008

  • USAFE_39th Contracting Squadron

    Replace Glass Priority Facilities

    October 2007

  • USAFE_39th Contracting Squadron

    Repair Accordion Folding Partitions,Consolidated, Building #878

    October 2007

  • USAFE_39th Contracting Squadron

    Repair Playground Surface

    July 2007

  • USAFE_39th Contracting Squadron

    Repair Hodja Inn Hotel Lobby, Building #1081

    February 2007

  • USAFE_39th Contracting Squadron

    Repair Refueling Area Tanks 1-2-3

    July 2006

  • USAFE_39th Contracting Squadron

    Repair Base Supply Warehouse / Deployement Center Facility No. 310

    May 2006

  • USAFE_39th Contracting Squadron

    AMC Terminal Warehouse

    Jan 2005

  • USAFE_39th Contracting Squadron

    New Arrival Passenger Terminal Repair and Construction

    August 2004

  • USAFE_39th Contracting Squadron

    Renewal of the Base Chapel

    August 2002

  • USAF 39 CONS/ LGCA

    Repair/Replace Chlorine Dosing System, Bldg 13

    September 2015