USAFE_39th Contracting Squadron

  • Contract No: FA5685-04-C-0011
  • Project Name: Repair Base Supply Warehouse / Deployement Center Facility No. 310
  • Contract Amount: 1,345,929.00 USD
  • Scope of Project: Project included the renovation works of all the hangar approximately 4000 m2. The main work items are; replacement of exterior panels, installation of 3 new roll-up door, new hot water boiler installation, design and installation of fire supression system, new offices, safe room, conference room, AAFES rooms, waiting areas with laminated sliding partition walls. Offices, carpet tiles, granite tile bathroom flooring, epoxy floor coating applied to the register area and apron entrance. Three each men and women toilet and shower units, fuel tanks and pipelines for generator and hot water tank, provide and installation of new generator complete with automatic transfer unit. Also, the roof of the building and steel construction were cleaned and externally painted with epoxy paint. Fire alarm system  were installed c/w radio transmitters and programmed, a pump room was constructed for fire supression system.
Geri

Back